HSA Commercial Real Estate represented Motion Industries’ renewal and expansion consisting of 81,800 square feet of industrial warehouse space located at 10441 N Beaudin Blvd (Internationale Centre) in Woodridge, Illinois. Motion Industries was outgrowing its original space of 44,100 square feet and needed to expand to meet the needs of its clients. Motion Industries wanted […]
Central Steel, a manufacturer of steel products specializing in the communications industry, was forced to relocate after the company’s Cicero facility was destroyed by a five-alarm fire on the adjacent property that ultimately destroyed both buildings in Cicero in January 2014. HSA represented Central Steel Fabricators, Inc. in the purchase of an 82,500-square-foot building at […]
Extensive research and analysis on vacancy and absorption trends within the I-88 Corridor led HSA Commercial to develop the Aurora Distribution Center. The Aurora Distribution Center is comprised of two buildings (Phase I being 294,673 square feet and Phase II being 124,897 square feet.) The park is located on a 25.20 acre parcel at Bilter and […]
For many years Franciscan St Anthony Health – Crown Point sought to develop an outpatient clinic in the Lowell market. Their preferred site was challenged. Utilities needed to be run 1,200 feet to the property line, the property required a curb cut from the Indiana Department of Transportation, the site needed to be re-platted and […]
7901 S. 6th Street Oak Creek, WI 109,000 SF Multi-specialty Health Center Developed by HSA PrimeCare The Challenge: Froedtert was looking to expand its ambulatory presence in the South Milwaukee, WI market area. The hospital and HSA identified a prominent site in the market and market feasibility studies were completed. The Solution: HSA and Froedtert […]
Gateway Foundation, a Chicago-based not-for-profit corporation that provides effective drug and alcohol abuse treatment in community-based and corrections settings for people without financial resources, operates multiple facilities and campuses in several states. Although they had an annual operating budget of over $3.5 million for facility-related expenses annually, Gateway did not track facility costs as a […]